德国
照片:Dag Spant
Pressure pipelines at pumped storage power plant in Erzhausen
席尔瓦绿色燃料
席尔瓦绿色燃料 was formed in 2015 to develop and produce advanced biofuel to replace fossil fuels.
席尔瓦绿色燃料 finalized the construction of a demonstration plant to test groundbreaking production technology at the mg游戏官方网站 Tofte site in 2022. The plant is built within the old storage building at the industrial site at Tofte.
After a two-year validation period, the long-term goal is to benefit from the biomass value chain and build and operate a commercial biofuel facility. A possible investment decision is planned for 2025 and will form the centre of the future Tofte 行业 cluster.
公司 | 所有权份额 |
mg游戏官方网站 | 100% |
席尔瓦
mg游戏官方网站
席尔瓦绿色燃料 is located at the industrial site at Tofte
关键的事实
- Demo plant for second generation biofuel
- Made from forest feedstock
- Located at Tofte in Buskerud
- Test period from 2019 – 2020
- Can produce 4,000 litres of biofuel per day